Interim location for Woodridge

Woodridge and Interim library locations

The location for the interim Woodridge Library will be only a few blocks south of the current library — at 1790 Douglas Street NE.

The current plan for the interim space is to open a 4,200-square-foot modular unit in late summer.

The new Woodridge Library will open in 2015.

(Click on the image for a larger view of the current library location and the planned interim location.)

About these ads
This entry was posted in Construction Developments, News. Bookmark the permalink.

One Response to Interim location for Woodridge

  1. Pingback: Interim library opening date announced | The New Woodridge Neighborhood Library

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s